Solution

Our advantages

• it can improve the spontaneous self use rate of photovoltaic
• use the peak valley electricity price policy to arbitrage by cutting peak and filling valley
In case of mains power failure, the system can operate off grid to ensure the work of charging pile
When the transformer capacity is insufficient, the capacity expansion can be realized

Optical storage and charging integrated system

System block diagram

Applicable scenario

本站使用百度智能门户搭建 管理登录
苏ICP备2022021473号-1 苏ICP备2022021473号-1